Thursday, December 19, 2013

Back on the job at IOP

Wednesday December 18, 2013

Slow day, late start. I must be getting older. Lots of phone calls to welders, boat yards, vendors etc. Nurse Joan called from Phoenix to report that my cholesterol was "excellent". Cleaned up on the fly bridge and started to varnish (at last) only to discover that the varnish was "off" (I have no clue why, it was all milky) so I tossed the brush and the varnish and will have to replace tomorrow. Filled in the daylight hours by handling the chain and breaking out any stickers with a mallet. I am starting to stress a bit that I am running out of time!

Thursday December 19, 2013

Out the door at 8 AM on the way 180 miles to Greenwood to pick up the chrome plated windlass parts. Arrived about 11:30 AM only to find that one of the parts (the biggest!) had not been done correctly. The fellow immediately said that he would fix it and freight it to us at the IOP so we loaded the rest and headed back to the boat. On the way back we stopped and purchased new varnish and brushes (and Xmas lights for the boat, now installed.) Dinner with the young Taylors tonight.

Friday December 20, 2013

My shiny chain
Good varnish weather! Put the first coat on the Stb side this morning. Reassembled the windlass up to the "missing piece" and installed the chock. Pumped up the dinghy. Did a little shopping. My new specs arrived so I can see again!

Went to town and bought Deidre's Xmas present.

Not a bad day.






Saturday December 21, 2013

Good varnish day. Another coat onto the stb side. Gene brought the dinghy motor back so I immediately pimped it up a bit and took photos for Craig's List. Received three responses within the first 30 minutes, and only one was from Nigeria. We looked after Mason for a couple of hours midday so Ryan could get some sleep. Fitted a new rubber mat in the ER and happy with the result. Need to buy 3 more.

Fellow came to look at the outboard - no dice, pricing issue.

Sunday December 22, 2013


Progress! The French drain down the side of the house is complete. Ryan helped me shovel the rest of the gravel into the trench and redistribute the dirt from the trench. The area needs landscaping, but the drain is done.

Progress! Good varnish morning and I put coat #3 onto the stb side. One more and it will be even port/stb and then just 4 or 5 more coats overall and can start putting the flybridge back together again.

Three more responses on the outboard, no result. Breakfast out this AM with Mason (and Deidre, Ky and Ryan). Added another string of Xmas lights on the boat. One of the neighbors helped me take a 1/16" of the cabinet door that does not close. (Now I need a new chisel to countersink the hinge) Fired up the ElectroScan today (our tank is filling up again) and we managed a half dozen cycles! Has been a pleasant warm sunny day, but big fog bank has just rolled in off the ocean ahead of a cool change.

Monday December 23, 2013


Christmas lights on the boat
The weather has turned cold and windy, no good for varnish. Tried to focus on some inside jobs. Installed the new mats in the ER, countersunk and installed the galley cabinet. (Not happy with the result, will have to have another go.) Rest of the day shopping and then drove 50 miles down to Rockville to check out the boat yard where we are  taking Tide Hiker to install the solar panels. Uncomfortable ride back in the rain.






Tuesday December 24, 2013


Engine room mats

Couple more calls on the motor with no result.

















Wednesday December 25, 2013 


Kylie and Mason visited us on the boat this morning. They are both a bit sick, Ky cannot talk and Mason has a bad cough. But he is still basically a happy kid.

We walked over at 4 PM and opened presents and had dinner. It was a very pleasant afternoon.

Tomorrow we are taking Mason to the doctor.





Thursday December 26, 2013
Spent all day on the computer researching what "hot-spot" to buy. The cell phone companies have made the industry such a mess with all their restrictions. I eventually gave up and bought a unit that I hope will do the trick. Also researched antennas for the hot-spot and purchased one. Researched "Morse" control cables as I need a couple of spares. Quiet evening.

Friday December 27, 2013

Called the chrome guy to ask where my part was - surprise, it was sitting on his desk as he "did not know where to ship it." (This is a family blog so I will not comment further.) Spent an hour or so on EP accounting and printed all the February rent invoices. Too cold for varnish. So I cleaned up the Fly Bridge and wet sanded all of the varnished wood. There is a chance that it will be warm enough tomorrow to varnish. Going out for Mexican dinner with Stan and Nancy.

Saturday December 28, 2013

Deidre was up sick all night. I slept OK but woke up feeling like I had been hit by a bus. Deidre went back to bed after "breakfast". I zipped up the Flying Bridge and put a small room heater to warm it up. Seemed to have an effect so I varnished the seating area and parts of the rail - maybe 75%. Its going to be warmer tomorrow, but rain is forecast. After that focused on a few inside jobs but really dragged. No more Mexican for a while.

Kylie and Mason seem to be steadily recovering. At least the cricket news was good.

Sunday December 29, 2013

Better day today. Went out for breakfast, then drove to Summerville to look at an outboard motor. Absolutely poured with rain, clouds down to the ground. Weather cleared as we returned and I decided to attempt to varnish - getting a bit desperate. Deidre helped. It was reasonable warm with quite a breeze, and it did not rain for the rest of the day and the wind has died. So we have maybe 5 coats applied overall. Couple more and we will can start putting the boat back together. Spent the rest of the day sorting at the house.

Monday, December 30, 2013


Beautiful!
Up early and drove 1 hour to the welder's place. The solar frame was assembled but not welded. We went over the measurements and I gave him the OK to proceed. Back on the boat I sanded yesterdays varnish and then met a guy at the house who was interested in the outboard. Sold it! Not for quite the price I wanted, but good enough, and I need to move on. Back on the boat it was a bit too late/cool to varnish the exposed rails so I just gave the seats a quick coat. (I think they are about complete). UPS arrived and we received all sorts of goodies. The last part of the windlass, the new carpet runner for the Salon and the new "HotSpot" (for the Bahamas). Inspired, I cleaned out the chain locker and completed the reassembly of the windlass. Tomorrow, the chain! :)






Tuesday December 31, 2013

Loading the chain
Hard day, and boy am I tired. Ky brought Mason over for pancake breakfast. He has his first tooth!

After a 1/2 dozen pancakes (gotta keep up the energy) I headed onto the flybridge and wet/dry sanded yesterday's coat. Then over to Ky's and loaded the chain into the trunk of the rental. Unloaded the chain at the top of the path to the marina and dragged it out into a straight line - turns out it is actually 225' long. Deidre helped me mark it every 25 feet then attach the colored zip ties. Then we dragged the chain down to the dock and the boat.

I had been promised "minimum stickers" (chain links that are stuck together with zinc) but as we threaded the chain thru the windlass it became apparent that we had lots of stickers - maybe even 10%? It was impractical to try and deal with them thru the windlass, so I set up on the dock and inspected each link and broke the stuck one apart with a hammer. Hard work and took all afternoon.

First "teething" rusk
Meanwhile Deidre gave the chairs another coat of varnish - still too cold to do the rails.

Tonight we have invited friends over for dinner. Should be fun if I can stay awake.















Wednesday, January 1st, 2014

So much for 2014 - cold and windy all day. I managed to get outside long enough to cut a foot or so from the end of the anchor chain, where the links looked a bit worn. Then we took the boat over to the marina for a pump out - seems simple but took us about 2 hours. Since the anchor project is complete I was able to back the boat in. After that - shopping for mats and some hardware for the solar panels. Its still raining.

Thursday, January 2nd, 2014

I am starting to stress about getting getting it all done in time - only 10 days remaining. Rained all day. It's hard to get anything done. We spent some time shopping and now have the "mat situation" under control. The new Salon "runner" looks good, ditto the Pilot House. (We have some stains to cover-up.)

Came across another potential used motor today but after some initial excitement had to nix it. So I changed plan and started researching the new option. By 9PM purchased a new Nissan 9.8HP short shaft. Done.

Friday, January 3rd, 2014

Bitterly cold and windy night. I got up about 4 AM to check on some noises and got very cold. The temp was 32F when we got up at about 7:30 AM and headed off to the welder. The place was closed when I got there and after a couple of phone calls our plans were changed to Sunday! It was a two hour drive for me!

A few more boxes
Started hauling boxes back to the lazarette and probably have 75% loaded now. Ryan loaned me their Christmas present to haul the boxes. Also "rebuilt" a macerater pump.

Went to bed at 8:30 PM









Saturday January 4th, 2014

Another cold night, down to freezing. The freezing seems to be affecting the varnish on parts of the boat, as if there is moisture under it that is turning to ice. Not a happy thought.


Stb Side
 Continued on with packing and reloading the laz and I am now happy to report its done. I also seem to have found some space that we can use for stored for the Bahamas.

Dinner at Ky's tonight.
Port Side




























Sunday January 5, 2014

Breakfast out with Don and Barb from Cavarra. Looks like we are both planning to head south about the same time and may cruise to Stuart together. The temperature had recovered into the 60s (but with rain threatening) and so as soon as we returned to the boat I scurried to give the rails another coat. The rain held off but a cold fog rolled in about 5PM.

Last thing at the house is our hose inventory - Deidre helped me make a detailed list and then returned them to the boat. The garage is now about 99% clear of boat stuff.

Opened up one of the main engine heat exchanges and found a moderate amount of clogging so started to "rod" the tubes with a 1/8" dowel. Interrupted by a visit from the welder with the new Sat TV antenna post  to test. Ky popped in after dinner for a chat. We kicked her out at 9PM for the first episode of "Downton Abby". First things first!!

Monday January 6, 2014


Deidre picking out debris after rodding
 Continued rodding and cleaning the two heat exchanges with reasonable success. They are not perfect but definitely improved. Decided to change the end gaskets, so ordered them from Virginia and moved onto the Racor. Wanted to take one apart and clean it for the first time. Was a simple task but awkward and I ended up spilling a bunch of fuel, which was frustrating.

The weather is really deteriorating. Wind is up and the temp is dropping. Most of the country is caught in a deep freeze, and we expect to go down to 22 F tonight.


Some of the result

I have turned off the water pump and drained the pipes as best I can. I have put the small room heater in the ER to run all night. The wind is gusting, it is frigid outside.










Tuesday January 7, 2014

The temp was 22 degrees when we got up. Two of the outside taps had frozen but came to life after a minute of the heat gun. Ky called and told me their outside taps have frozen so I went over there and gave them the same treatment and left them dripping.

At about Noon we headed over to the welders. Pleased to see that he had completed the roll bar for the dinghy and the antenna post for the Sat TV and the new 4G aerial. They look great. The frame was also ready to install the solar panels. Deidre and I installed one panel and will return tomorrow for the rest.

Back at the boat the temp was dropping fast again and the water was still off. We received an email that Fedex had tried to deliver the new outboard while we were away.

Wednesday January 8, 2014

We were back at the welders by 10 AM and had fitted the two remaining panels by Noon. Then took the whole thing apart and packed up the panels so they could be independently transported to the yard next week.

Back to Mt Pleasant we picked up the outboard at Fedex and squeezed it into the rental.

Ryan called and asked us to pick up Mason from day care and look after him till one of them made it home.

Still no water on the dock and since we had not filled our tanks we ran dry. After dinner I put a bucket of sea water in the bathroom so we could flush the toilet during the night.



Thursday January 9, 2014

The water was turned back on nice and early. First job was to toss out the un-used saltwater in the bathroom bucket, only to discover that there were 1/2 dozen small fish in it! I feel bad for their friends who will make it back into the ICW via a less direct route. Installed the roll bar and the motor on the dinghy. I expect we will relaunch it Saturday when Ryan is home.

Lunch with our "dock host" Charlie Ridley. Charlie is a recently retired attorney and is an excellent cabinet maker. Hearing of the problem with our cabinet door he swung into action, and we already have the door back and in one piece. I headed down to the ER and installed the new heat exchange gaskets and bled and started the engines, and tried to put stuff away. Deidre drove to COSCO and returned loaded with more stuff. I am starting to worry about our Plimsoll line. Three days remaining.

Friday January 10, 2014


Glare screen, knick-knack boxes and varnish!
No more time for varnishing so Deidre and I cleaned the Isen glass and re-installed the glare shield on the Fly Bridge. I had lost one of the support pieces overboard when I was dismantling the shield, and so asked our welder to make me a replacement. Turns out I had replaced the wrong piece, so we had to do a work-around. Otherwise, it all went back together well. Then tried my hand at a bit of fiberglass repair - will do better next time. Spent the rest of the day trying to put everything away and eventually got to wash down the deck. Dinner at Mark & Donna's. Two days to go.

Saturday January 11, 2014


Back from Cosco or Walmart
Heavy wet fog all day until a series of thunder storms blew through about 5 PM. Made it unpleasant to work around the boat. The new C-Map chip arrived via mail yesterday and it worked! Thanks goodness, we have navigation again.

Re-installed the knick-knack tray on the fly-bridge. Ryan came over and we lifted the freezer back into place. Then we used his truck to launch the dinghy. The new motor (eventually) started and I motored back to Tide Hiker in the marina. We have to turn Tide Hiker tomorrow and load the dinghy. Took the rental back to the airport.
Bloody miserable weather


One day to go.














Sunday January 12, 2014

King Neptune must think highly of us because today's weather was perfect - sunny and cool.

We needed to turn the boat to load the dinghy, so since we were under way we headed over to the marina for a pump out. It was good to see the dink back on deck. Deidre runs the hoist - her immediate reaction was that the dinghy was "obviously much lighter!" Success!The kids came over for lunch. Mason was in a great mood.

Dink is back - new engine and new roll bar!
The rest of the day we packed, cleaned and organized. I turned on the freezer and loaded with ice as a test. By dinner we were pretty tired so we borrowed Ky's car and went into town for dinner.







Thursday, December 5, 2013

Anthem, AZ

Dec 4, 2013

Safe and sound at the house in Anthem. The trip was uneventful except for the "lady" that sat in the middle seat between me (window) and Deidre (Aisle). She was suffering from a bad dose of the black plague, or maybe tuberculosis or just pneumonia, but if Deidre and I survive this trip without getting what she had I will report it to the Pope and ask for declaration of a consecrated miracle.

Fortunately, the house was just as we left it - a 13 month time capsule. The electricity was on but water and gas were off. I have a bunch of 5 gallon buckets that I fill at the neighbor's tap and flush all the toilets. The water and gas people come Thursday (hopefully in the AM)

After the boat this little house feels enormous, and the giant King sized bed looks very inviting,

December 5, 2013

The water and gas were on by 8:40 AM and I was showered and at the doctors by 9:30 AM (Blood) followed by the Eye Doctor (Eyes) by 11:15 AM and then back to Anthem to get Deidre and back to Dr. Dicks (Teeth) by 2:50 PM. Popped in on Bill & Tony's on the way home. Anthem is "a bit out of town" so it was a 150 mile day. Quiet evening.

Friday December 6, 2013

Deidre left at 9 AM and was at Mayo Clinic all day. I got a hair cut. Dinner with Dick and Marcia.

Saturday December 7, 2013

Lunch at Dicks with Nick and Lyn (who are visiting from Boston) and we managed to drink 3 bottles of champagne. Quick drive back to Anthem to shower and dress up for the GlobeNet Christmas party.

Sunday December 8, 2013

Easy morning - Sunday paper and coffee. Really nice Lunch at Kerry and Julian's (expatriate Aussies) Stopped at Cosco and ordered my new glasses, then back home for a quiet evening.

Monday December 9, 2013

Deidre was off early today for her physical, Pap test, mammogram, new shoes, and renewed drivers license - not bad! I stayed home and had lunch with Bill.Tomorrow is "my day". The TV has no service and we have  no CDs except the Collingwood-St Kilda Grand Final - the one that we won!

Tuesday December 10, 2013

My doctor day today - skin guy at 9 AM (all clear) followed by prostate guy at 10:30 AM who cancelled (must have had a sore finger) so I had to kill time till the GP at 3 PM (all clear). Deidre stayed home and hosted the termite treatment crew. 

Wednesday December 11, 2013

Deidre at the eye doctor in the morning followed by a bit of shopping at the local "outlet mall". I bought 5 nice quality pieces of clothing for less than $50. Dick visited for dinner at our place.


Thursday December 12, 2013

Deidre at the GP's first thing followed by a visit to the license place. Back to Anthem to hand over the car to me to drive back into town for my delayed prostate doctor at 3 PM. Then out will Bill and Cleveland friends for a few beers and pizza.  

Friday December 13, 2013

Met with Rick Keyt our attorney at 10 AM wrap up wills and trusts. Followed immediately by lunch with Steve Lance our insurance.& annuities guy. Quick bit of Xmas shopping and back then back to Rick for the signing. (Strikes me that Friday 13 was a bad day for that, but Rick assured me that "Superstitions only bring bad luck!") Then I stooged while Deidre met up with her teacher friends for a Friday night drink. Back to Anthem for Chinese.

Saturday December 14, 2013

Pretty much a free day. Deidre's old school Xmas party that night. Packed. 

Sunday December 15, 2013

Euclid Partners meetings in Las Vegas this week. Bill picked me up at about 9 AM and we caught a flight to LV and checked in at "Paris" by 11 AM. Our partners Don and Marietta arrived in time for lunch and we debated our issues for a couple of hours. Debate continued over a very expensive and very ordinary dinner that night. 

Monday December 16, 2013

EP meetings at breakfast, lunch and dinner. In between the partners gambled and I walked around looking at the LV sights. It is an amazing and crazy place. Another expensive and ordinary dinner.

Tuesday December 17, 2013

I was up at 4 AM to catch my flight back to Phoenix. Deidre met me at Phoenix airport and we continued on to Charleston. Safe and sound on Tide Hiker by 9 PM 











Monday, December 2, 2013

Isle of Palms

Monday December 2, 2013

We leave Wednesday for Phoenix. The re-galvanized chain is ready and so I plan to drive to/from Jacksonville Tuesday. That gives us today to get organized. Kylie started her new job today, she dropped Mason off at day care and Ryan picked him up at about 4PM - they all seemed to do OK. I only had an hour to work on scraping and sanding. We took the boat up to the fuel dock for a pump out, as we will be away for almost two weeks.

Tuesday December 3, 2013

Big day. The rental car people picked me up at about 8:30 AM and I was on my way to Jacksonville by 9 AM. The chain was ready so I was on my way back by 2 PM. Made good progress till I stopped for gas, then pulled out of the gas station the wrong way! Took about 25 miles for me to realize my error - dark and featureless road is my only excuse! I was tired when I arrived back at the boat, having driven 540 miles in the day. But the chain looked shiney!

Another big day tomorrow.