Work on Tide Hiker

Now that Deidre can walk around and is driving, I have resumed work on Tide Hiker. The current project is to update the Salon:

* New carpet has been ordered (also in the master stateroom and vee birth).
* Maybe a new "L" shaped couch. We plan to drive to Florida next week to look at "boat furniture"
* Remove and refinish the desk. Its ready, just waiting on the new carpet. I was able to work on it while Deidre was recovering.
* Re-varnish the teak woodwork in the Salon. Underway
* Re-cover the window valances.


The "desk" is in the garage at the house, ready to be re-assembled and installed.

The starboard side of the salon has been sanded and given two coats of varnish - two to go

The stairs to the Pilothouse and Bridge have two coats.